    MNS低壓配電柜安裝規范是什么?

    發布時間:2021-05-17 來源:http://www.serie-d.com/ 瀏覽量:

    1.安裝前對準備工作的檢查
    1. Check the preparation before installation
    在安裝前,MNS低壓抽屜柜監理工程師及甲方工程師要檢查進場道路是否暢通,必要時要求要求總包單位修建簡易運輸通道與各安裝點連接,施工場地布置應滿足文明施工的要求。同時還應檢查安裝單位的施工機具安排狀況,督促安裝單位對施工機具進行檢查,確保狀態良好。壓設備到達現場前,配電室、地溝、基礎槽鋼應已完全竣工
    Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
    1)、配電室
    1) . distribution room
    配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細圖紙交予施工方(合同簽訂后2周內,重 點要落實客戶對圖紙的位置、內容、完成時間確認),并且在配電室建設過程中,我方或協作單位的技術人員要在現場監督,避免施工錯誤。(配電室建設大約需2周左右)
    Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                               MNS低壓抽屜柜
    2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預留的設備風道相對應,設備離墻的小距離要明確(距離太近,設備的柜門打不開)。(槽鋼焊接大約需2天,我方技術人員必須到場指導)
    2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
    設備到達現場:
    Equipment arrival at site:
    3)、若配電室、地基若未建好,低壓配電柜設備要有存放位置(要防雨或提供必要的防雨材料)。
    3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
    2.安裝
    2. Installation
    2.1各配電房門窗須嚴密,低壓配電柜房內清潔。
    2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
    感謝您的閱讀,希望以上內容對您有所幫助,如您想了解更多精彩內容請點擊我們的官網:MNS低壓抽屜柜http://www.serie-d.com
    Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://www.serie-d.com .
    首頁首頁 產品產品 電話電話 置頂置頂
    亚洲色偷偷色噜噜狠狠99网| 亚洲精品91在线| 亚洲伦理一二三四| 亚洲精品福利视频| 国产亚洲精品精华液| 中文字幕亚洲无线码a| 亚洲精品A在线观看| 国产成人综合亚洲绿色| 亚洲av无码专区国产不乱码| 亚洲av午夜电影在线观看| 亚洲日本在线电影| 亚洲精品色播一区二区| 亚洲日韩精品A∨片无码加勒比| 日韩亚洲人成在线| 中日韩亚洲人成无码网站| 亚洲色精品VR一区区三区| 亚洲 暴爽 AV人人爽日日碰| 99999久久久久久亚洲| 亚洲精品福利你懂| 亚洲国产区男人本色在线观看| 亚洲天堂2017无码中文| 亚洲中文字幕无码久久| 亚洲精品无码日韩国产不卡av| 亚洲人成网站色7799| 亚洲成a人片在线不卡一二三区| 亚洲av日韩专区在线观看| 亚洲AV成人无码网站| 亚洲阿v天堂在线2017免费| 亚洲福利在线播放| 中文亚洲成a人片在线观看| 亚洲毛片αv无线播放一区| 亚洲成AV人片在线观看ww| 亚洲免费视频在线观看| 亚洲国产一区二区a毛片| 久久亚洲AV无码精品色午夜麻豆| 亚洲激情黄色小说| 99999久久久久久亚洲| 色欲aⅴ亚洲情无码AV| 亚洲天堂免费在线视频| 亚洲人成伊人成综合网久久久 | 亚洲综合色在线观看亚洲|