    開關(guān)柜為什么叫“成套配電裝置”?

    發(fā)布時間:2023-03-08 來源:http://www.serie-d.com/ 瀏覽量:

    常見的低壓配電柜、高壓配電柜其實并不是單單指配電柜本身,它實際上是我們俗稱的電氣成套設(shè)備,其實這種叫法是不準(zhǔn)確的,學(xué)名應(yīng)該是“成套配電裝置”。那么開關(guān)柜為什么叫“成套配電裝置”?下面小編為您講解:
    The common low-voltage distribution cabinet and high-voltage distribution cabinet are not only the distribution cabinet itself, but actually the electrical complete set of equipment we commonly call. In fact, this name is inaccurate, and the scientific name should be "complete set of power distribution device". So why is the switch cabinet called "complete power distribution device"? The following editor will explain to you:
    成套配電裝置是以斷路器為主的電氣設(shè)備,成套配電裝置是制造廠成套供應(yīng)的設(shè)備,由制造廠預(yù)先按照主接線的要求,將每一回路的電氣設(shè)備高低壓電器(包括控制電器、保護(hù)電器、測量電器、如斷路器、隔離開關(guān)、互感器等)以及母線、載流導(dǎo)體、絕緣子等,裝配在封閉或半封閉的金屬柜中,構(gòu)成各單元電路分柜,此單元電路分柜成為成套配電裝置。安裝時,按主接線方式,將各單元分柜(又稱間隔)組合起來,就構(gòu)成整個配電裝置。
    The complete set of power distribution device is the electrical equipment mainly based on the circuit breaker. The complete set of power distribution device is the equipment supplied by the manufacturer in a complete set. The manufacturer assembles the high and low voltage electrical equipment (including control electrical equipment, protection electrical equipment, measuring electrical equipment, such as circuit breaker, disconnector, mutual inductor, etc.), bus, current-carrying conductor, insulator, etc. of each circuit in a closed or semi-closed metal cabinet according to the requirements of the main wiring in advance, Each unit circuit sub-cabinet forms a complete set of power distribution device. During installation, each unit and sub-cabinet (also called bay) are combined according to the main wiring mode to form the whole power distribution device.
    電氣成套
    在電器成套設(shè)備中把母線、隔離開關(guān)(高壓)、刀開關(guān)(低壓)、斷路器(空氣開關(guān))、電壓互感器、電流互感器、電力變壓器、交流接觸器、保護(hù)繼電器(熱繼電器)、避雷器等組成的設(shè)備叫一次設(shè)備。由它們按照原理關(guān)系所組成的回路稱為一次回路或一次方案圖。
    In the complete set of electrical equipment, the equipment consisting of bus, disconnector (high voltage), knife switch (low voltage), circuit breaker (air switch), voltage transformer, current transformer, power transformer, AC contactor, protective relay (thermal relay), lightning arrester, etc. is called primary equipment. The circuit composed of them according to the principle relationship is called primary circuit or primary scheme diagram.
    為了使一次系統(tǒng)能可靠、穩(wěn)定地運行,隨時監(jiān)視一次系統(tǒng)運行狀態(tài),同時能隨時控制一次系統(tǒng)所必須配備許多其他電器元件及設(shè)備。如:測量儀表(電流表、電壓表、功率因素表、功率表、頻率表等)、控制信號元件(信號燈、按鈕、轉(zhuǎn)換開關(guān)等)、繼電保護(hù)裝置等。由它們按照原理關(guān)系所組成的回路稱為二次回路或二次方案圖。
    In order to ensure the safe, reliable and stable operation of the primary system, monitor the operation status of the primary system at any time, and control the primary system at any time, many other electrical components and equipment must be equipped. Such as measuring instruments (ammeter, voltmeter, power factor meter, power meter, frequency meter, etc.), control signal elements (signal lamp, button, universal transfer switch, etc.), relay protection devices, etc. The circuit composed of them according to the principle relationship is called secondary circuit or secondary scheme diagram.
    成套配電裝置的特點
    Characteristics of complete power distribution device
    1、成套設(shè)備有金屬外殼(柜體)的保護(hù),電氣設(shè)備和載流導(dǎo)體不易積灰,便于維護(hù),特別是對外處的污穢地區(qū)時更為突出。
    1. The complete set of equipment is protected by a metal shell (cabinet). The electrical equipment and current-carrying conductor are not easy to accumulate dust and are easy to maintain, especially in the external polluted areas.
    2、成套設(shè)備易于實現(xiàn)系列化、標(biāo)準(zhǔn)化、具有裝配質(zhì)量好、速度快、運行可靠性高的特點。由于進(jìn)行定型設(shè)計和制作生產(chǎn),所以其結(jié)構(gòu)緊湊、布局合理、縮小了體積和占地面積,降低了造價。
    2. The complete set of equipment is easy to realize serialization and standardization, and has the characteristics of good assembly quality, fast speed and high operation reliability. Due to the finalization design and production, the structure is compact, the layout is reasonable, the volume and floor area are reduced, and the cost is reduced.
    3、成套設(shè)備的電器安裝、線路敷設(shè)與變配室的施工是分開進(jìn)行的,縮短了基建的時間。
    3. The electrical installation of the complete set of equipment, the line laying and the construction of the transformation and distribution room are carried out separately, which shortens the time of capital construction.
    以上就是問題的相關(guān)解答了,希望能夠給您好的幫助,如果您對此有什么不了解的地方或者需求,就來我們網(wǎng)站http://www.serie-d.com咨詢了解吧!
    The above is the relevant answer to the question. I hope it can help you. If you don't know anything about it or need it, please come to our website http://www.serie-d.com Ask about it!
    首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
    天天爽亚洲中文字幕| 亚洲欧洲日韩综合| 亚洲一区二区三区亚瑟| 久久精品国产精品亚洲毛片| 亚洲不卡中文字幕无码| 亚洲va无码手机在线电影| 国产亚洲免费的视频看| 亚洲色婷婷六月亚洲婷婷6月| 丝袜熟女国偷自产中文字幕亚洲| 亚洲精品视频在线看| 亚洲男人的天堂在线va拉文| 亚洲国产精品尤物yw在线| 亚洲国产成人影院播放| 亚洲精品无码专区久久同性男| 亚洲电影日韩精品| 亚洲日韩涩涩成人午夜私人影院| 亚洲色图综合在线| 亚洲中文字幕无码爆乳AV | 国产精一品亚洲二区在线播放 | 亚洲中文无韩国r级电影| 超清首页国产亚洲丝袜| 亚洲狠狠婷婷综合久久久久| 亚洲VA中文字幕无码一二三区 | 亚洲国产精品自在线一区二区 | 亚洲成a∨人片在无码2023| 老牛精品亚洲成av人片| 亚洲精品一级无码鲁丝片| 亚洲色成人网站WWW永久| 亚洲动漫精品无码av天堂| 久久精品国产亚洲AV嫖农村妇女| 亚洲精品一区二区三区四区乱码 | 亚洲一级片免费看| 国产亚洲精品资源在线26u| 亚洲成色999久久网站| 亚洲人成日本在线观看| 亚洲中文无码永久免费| 亚洲AV中文无码乱人伦| 亚洲乱亚洲乱妇无码麻豆| 亚洲最大的成网4438| 亚洲av乱码一区二区三区| 亚洲国产成人久久精品软件|